Latest company case about Smart Campus Central Air Conditioning Control
Successful Case
"
Corporate Solutions

Smart Campus Central Air Conditioning Control

2026-09-11

Scenario. A multi-building campus – teaching blocks, library, canteen and student services – operates a central chiller plant serving fan coil units in hundreds of rooms. Each building has its own plant room, and the campus facilities team needs one view of the whole site.

The challenge

  • Fan coil units were controlled locally with no central supervision, so out-of-hours running went unnoticed.
  • Running control cable to every room would have meant disruptive building work.
  • Plant rooms already used different protocols, so a single front end could not read everything.

How the system is built

  • Room level: TFHV-SK-FVVMD-S3-CK-Z wireless fan coil thermostats replace local controls. The ZigBee link removes the need for control cable to each room.
  • Wireless backbone: Matywirt ZigBee protocol converters bring the wireless thermostats into the BACnet system, so room setpoints appear alongside wired plant data.
  • Plant level: MVC-WMB-1866BA field controllers supervise the chiller plant and AHUs, with 12 analogue inputs, 12 digital inputs and 6 digital outputs per controller.
  • Integration: MatyLink QSP-400B gateways convert Modbus RTU plant data to BACnet/IP or BACnet MS/TP so existing plant equipment is not replaced.

Why it works

Wireless room control avoids cable installation, while BACnet integration lets the facilities team see room and plant data in one place – the basis for scheduling, out-of-hours shutdown and energy reporting.

Products used

TFHV-SK-FVVMD-S3-CK-Z wireless fan coil thermostat · Matywirt ZigBee protocol converter · MVC-WMB-1866BA field controller · MatyLink QSP-400B gateway